New Door Entrance
The previous door entrance
(we hack off the side so the walkway look bigger)
The fire-rated walls and door frame are up already and the previous door frame and wall is being hack away. We're pending for the fire-rated door installation on 20 Nov, the access balcony is already level up and pending for installation of the walls. The worker need to increase another 3cm cement on the wall before installation of the windows to reach 100cm (require by HDB). Really ma-fan! It's has been raining for the past 1 week continuously, really worry about the tiling work done on the access area. Hope all goes well :D
Store-room (tiles up)
Electrician at work!
They're around for the past few days for do up the electrical wiring before the false ceiling is up and also trucking to be done in the whole house
Air-con installer, doing up the piping for our house.